SERVICES / PILING & CIVIL WORKS

PILING & CIVIL WORKS

Execution capability for piling, foundations, irrigation infrastructure and retaining-wall works—supported by multiple piling methods selected around site access, project requirements and engineering conditions.

01 / SCOPE OF WORK

FROM GROUNDWORK TO STRUCTURAL SUPPORT

PILING

Precast pile installation for building, industrial and infrastructure works using equipment and methods suited to the project conditions.

FOUNDATION

Foundation construction associated with pile-supported structures and other project-specific substructure requirements.

IRRIGATION

Civil construction for irrigation channels, waterways and related infrastructure incorporating appropriate concrete and precast systems.

RETAINING WALLS

Retaining-wall construction using engineered systems such as CCSP and other solutions selected around ground and project requirements.

02 / METHODS OF WORK

THREE METHODS. SELECTED FOR THE SITE.

The piling method is selected according to pile type, access, working area, surrounding environment, required capacity and project methodology. Detailed method pages will document the equipment, sequence, controls and site requirements for each system.

01 / EXCAVATOR-MOUNTED DIESEL HAMMER

Impact pile-driving arrangement using a diesel hammer supported by an excavator-based carrier. The configuration can provide practical mobility and positioning on suitable sites.

Detailed method page → equipment configuration, pile handling, driving sequence, monitoring, access requirements and safety controls.

02 / CRANE-MOUNTED DIESEL HAMMER

Conventional impact-driving setup combining lifting and pile handling with a crane-supported diesel hammer system. Suitable configuration depends on pile length, lifting radius and site working space.

Detailed method page → crane and hammer setup, pitching, alignment, driving, pile extension where applicable, quality records and HSE controls.

03 / HYDRAULIC STATIC PILE DRIVER — HSPD

Static pile installation by hydraulic pressing rather than impact driving. The system enables pressing force to be monitored during installation and can reduce impact-related vibration compared with hammer driving.

Featured method: our detailed HSPD section will use the Sunward ZYJ160 method documentation already developed, including equipment layout, personnel, working sequence, pile positioning, pressing and QC controls.

03 / PROJECT EXECUTION

METHOD BEFORE MOBILIZATION

01 — Review
Review drawings, pile schedule, geotechnical information, access and project constraints.

02 — Method Selection
Coordinate the piling system and supporting equipment with the required pile and site conditions.

03 — Site Preparation & Mobilization
Confirm working platform, access, survey controls, lifting zones and equipment positioning.

04 — Execution & Records
Install in accordance with the approved method while maintaining alignment, installation and quality records.

04 / QUALITY & HSE

CONTROLLED EXECUTION ON SITE

Execution planning incorporates survey control, pile handling, equipment inspection, installation records, working-platform conditions, lifting controls and site-specific HSE requirements. Detailed controls will be defined on the individual method pages and project method statements.

PROJECT ENQUIRY

Share the project location, pile type and size, pile length, estimated quantity, soil information, access constraints and available drawings. Adhipatama can review the suitable execution approach with your project team.